Pool is almost done !
Room's at the pool side with beach view .
Our bungalow's on the beautiful way!!!
Step's going up to the different level's of the property .
Restaurant view deck
Our dive boat just arrived
Dive shop is almost ready
But still some more digging is on going for the stairways ( endless ) all man power !!!!
everybody is helping :-)
End of the Day.
Monday, May 4, 2015
Monday, February 2, 2015
Pool and villa's
We are done concreting the pool . a lot of steel and wood work was done to bring the pool in perfect shape .
standard rooms / mix of modern and native elements
for the pouring the concrete it took as 9 H and 350 bag of cement.
after we removed the form
The villas on the hill side
standard rooms / mix of modern and native elements
Friday, December 19, 2014
ALMOST THERE!!!!
Its been a while of NO update and posting...
it looks like we are not busy enough!!!!
At front BAR and the water feature are clad with river stone....
Our dive shop is getting beautiful.....
Dive shop, cleaning equipment area....
Water piping for the pool, need concentration ....
Finally the restaurant floor done concreting. And the bare wall turn into a beautiful natural stone...
Restaurant area...
Here we go!!! from bare wall to lime stone cladding on dive shop view deck...
Another river stone cladding just in front of our pool...
The stairs going up to 3rd floor.....
The front view and the pool area ....
The view from the 3rd floor to our 4 units of fabulous villa later....
And now waiting for our glass windows, furniture's, tiles, and more to be here on time. But it doesn't mean we stop working, we keep on working there are more work to do while the other details materials is on their way.
it looks like we are not busy enough!!!!
At front BAR and the water feature are clad with river stone....
Our dive shop is getting beautiful.....
Dive shop, cleaning equipment area....
Water piping for the pool, need concentration ....
Finally the restaurant floor done concreting. And the bare wall turn into a beautiful natural stone...
Restaurant area...
Here we go!!! from bare wall to lime stone cladding on dive shop view deck...
The stairs going up to 3rd floor.....
The front view and the pool area ....
The view from the 3rd floor to our 4 units of fabulous villa later....
Swimming pool and Bar view, from the dive shop view deck..
View from the beachfront to our villa .......
The view from the upper villa, wonderful....
Another view from the upper part of the resort...
And for sure the chef been waiting for the granite and kitchen sink,
finally arrived and is on progress ....
After a hard work the whole day, a beautiful scenery of early evening greet us....
And now waiting for our glass windows, furniture's, tiles, and more to be here on time. But it doesn't mean we stop working, we keep on working there are more work to do while the other details materials is on their way.
Subscribe to: