One more time rose try her best to make our stay here as comfortable as possible .
Thats why she decide to make pizza.
Yummy !!!!!
Ready for the fire !
We getting closer :-)
And closer ....................
Welcome to Italy !!!!!!!!!
Savannah gives a try , for sure the topping will be chocolate :-)
Saturday, October 26, 2013
Friday, October 25, 2013
Water supply
Construction with out water is impossible , so here we go with the next step , getting water from the source with a 2 inch pipe .
The source is around 35 meters above sea level , so we need to carry the main pipe all the way up , well luckily not my job :-)
The water source is inside the cave with a big and deep pool of fresh water , well the entrance of the cave is quite small but i fit in .
But now we are done and the water is flowing , this pipes is just a temporary set up for the construction time
( we will arrange it properly ones we have the final layout of all structures )
Wednesday, October 23, 2013
YES !
Here we go !!! Soon we will have power supply , bye bye generator !!!!!!!
The power company ( Noceco ) promised us that we will be connected by end of next month , we will see :-)
transformer just arrived .
The power company ( Noceco ) promised us that we will be connected by end of next month , we will see :-)
transformer just arrived .
Sunday, October 20, 2013
Fresh bread
Bread in a pot
While we are working on the property , rose try different ways to bake bread because we don't have a oven .
So that's the solution :
And the result is great ! all made on fire , delicious !!!!!!!
While we are working on the property , rose try different ways to bake bread because we don't have a oven .
So that's the solution :
And the result is great ! all made on fire , delicious !!!!!!!
Wednesday, October 9, 2013
We Transfer !!!!!
Good bye sipalay city !!!!!
We had a good time here , but city life is over now.
And welcome sipalay campomanes bay :-) Back to nature , we are living now just a 100 meters away from the property where the construction soon will start .
We had a good time here , but city life is over now.
And welcome sipalay campomanes bay :-) Back to nature , we are living now just a 100 meters away from the property where the construction soon will start .
Monday, October 7, 2013
Bodega
Next step , we rent a small building just beside the property and that will be our bodega , to stock all materials for the construction .
Well this house is not in a good condition so we need to do some changes .
Well its not really a beauty but i am proud of it :-)
Well this house is not in a good condition so we need to do some changes .
Well its not really a beauty but i am proud of it :-)
After 3 days non stop rained we got here a lot of water ,a existing resort here in campomanes was flooded.
And the road between sipalay and hinoba-an was not in a good shape at the moment. !!
And finally me the holy driver !!!
Let's beginn
Well after the cleaning we decided to start with the fence so we have a better view of the total area .
just a simple one made out of bamboo , the digging was quiet hard , specially when you know you need to make around 56 holes :-(
But luckily i was not alone everybody helped as , specially the hard part to go all the way up with out steps .
But finally we are done !!!
Subscribe to:
Posts (Atom)