Thursday, November 28, 2013

Surprise !!!!!

We expected already that we will find rocks while digging for our foundation's but not that size , this is real big




But the digging goes on !!!! 6 meter still to go :-)


Our new septic tank has arrived and set at proper position , very easy ,fast and cheap !


Once all the foundation's and digging are done we will moving very fast .





Wednesday, November 20, 2013

endles digging and concreting


well we really need to get use to it , to work on a slope area , but we do good so far.


every single stone . one by one !!


everybody has own job or assignment.


i think by next week the first floor will be done .


Friday, November 15, 2013

starting the construction and storm yolanda.

Because of the very strong typhoon Yolanda we decided to start with the construction not as i said on the 7. of November . we moved the starting date to the 11. of November . luckily we was not affected by the typhoon and we was save .

Now the sun is out again and we moving forward . but before we start   breakfast first !!! :-)


Layout


digging


more digging


carry all the steel bars up is very heavy !!


4 of 15 foundation done


on the property we will install  a lot of little platforms to stock sand and gravel , for concreting foundation , sitting hollow blocks and flooring.
there are around ten guys their job is to bring all materials what we need all the way up !!! this guys do a really hard and good job !!!!


Thursday, November 7, 2013

truck's full of material

then wheeler truck from bacolod with cement , steel-bar , pipes , plywood


23 person helping to bring all the stuff in to the bodega before the typhoon HAIYAN will bring the rain !!



90pcs of plywood

400 sack's of cement

as well sand+gravel


We was really worried that the typhoon will bring the rain in that case our cement will get wet , but we was very lucky :-) 
after we was done it starts to rain . perfect timing

Tuesday, November 5, 2013

Start of construction ( spatenstich )

We will start on the 7th day. of November of the construction ( spatenstich ) a 2 story building on the upper right corner of the property .

Downer floor will be the laundry ,water supply , workshop and generator room.



upper floor will be our private accommodation :-)

 
 We really hope that the next typhoon will enter soon  in the Philippines don't stop as to go on !!!!!