Friday, December 19, 2014

ALMOST THERE!!!!

Its been a while of  NO update and posting...
it looks like we are not busy enough!!!!

At front BAR and the water feature are clad with river stone....





                Our dive shop is getting beautiful.....




   Dive shop, cleaning equipment area....




  Water piping for the pool, need concentration ....






  Finally the restaurant floor done concreting. And the bare wall turn into a beautiful natural stone...           





     Restaurant area...




 Here we go!!! from bare wall to lime stone cladding on dive shop view deck...








      Another river stone cladding just in front of our pool...




The stairs going up to 3rd floor.....




     The front view and the pool area ....

 



The view from the 3rd floor to our 4 units of  fabulous villa later....



Swimming pool and Bar view, from the dive shop view deck..


 

View from the beachfront to our villa ....... 


 
The view from the upper villa, wonderful....



Another view from the upper part of the resort...




And for sure the chef been waiting for the granite and kitchen sink, 
 finally arrived and is on progress ....






After a hard work the whole day, a beautiful scenery of early evening greet us....

  


And now waiting for our glass windows, furniture's, tiles, and more to be here on time. But it doesn't mean we stop working, we keep on working there are more work to do while the other details materials is on their way.
  

Wednesday, October 8, 2014

Busy day's

after two months no posting any pictures its about time again now . No we was not hanging around and enjoy the beach life.
We are working on the project every day as you can see on the following pictures.

This picture is done from the dive shop view deck towards to the resort.








And this is the view from rooms towards to the resort and dive shop.





view from the rooms to the beach well still need to do a lot of clean-up.




retaining wall by the view deck dive shop will be covered with natural stones .





going up from the view deck dive shop to view deck restaurant and rooms and villa's .




view from the view deck restaurant, this little building at the front is our bodega and will be removed after construction .




restaurant area .




the back wall of the restaurant will be covered as well with natural stone .




bar and lounge area




kitchen is almost done waiting for the delivery of the counter top .




a lot of space very important for the kittchen .






the first door example i have made, accepted and approved





in one week we will start with the pool  . digging again :-( but it will look amazing !!!!
pool area view from the rooms .





All in all we are doing good here . well sometimes we have realy bad weather , typhoon etc. and it make it very hard to build in this bad conditions.
But we go on !!!!


Tuesday, August 5, 2014

Next Level !!!

Our basement is almost done .



Flooring .The basement area will be used for pool equipment , laundry and other ...........................


Kitchen area , going up for next level.



Top view of construction side.



Retaining wall behind the dive shop .



The next big floor is ready all pipes and wires are set .

We start at 6 am in the morning.


we was done at 5pm.


44 workers


Friday, June 20, 2014

Rainy days .


last 2 day's rain non stop but we keep on working !!!


others removing again big rocks from the top of the property slowly down, very slowly :-)



and the best and amazing!!! the hanging guy , digging for the retaining wall .




difficult job,but every thing goes well :-)